Detachable Bed Preceding Construction Method "DFP Method"
Changing the layout is easy! You can move partitions during renovations without breaking the double floor.
The "DFP Method" is a removable floor-first construction method that allows for easy changes in floor plans. It employs a newly developed removable support base with a reinforcing adjuster. Reinforcing adjusters can be added under the floor without removing the base panel, and they can also be removed from underneath the panel. 【Features】 ■ Allows for the relocation of partitions during future renovations without damaging the double floor. ■ During new construction, it has a longer response time for floor plan changes tailored to needs compared to conventional floor methods. ■ Walking on the double floor after installation becomes safer, reducing the risk of accidents in subsequent processes. ■ Expected reduction in waste and improvement in construction pace. *For more details, please refer to the PDF materials or feel free to contact us.
- Company:淡路技建
- Price:Other